- General Contractor
- SunPower Corporation
- Engineer
- ABS Consultants/SunPower Corporation
- Architect
- SunPower Corporation
- Duration
- 6 months
Parking Structures Receive Solar
This project included the installation and wiring of over 8,118 solar arrays on three, 4-story parking garages that cover over 125,000 square feet. This system generates 1.75 MW DC and produces 5% of Belmar Shopping Center’s total power consumption.
