- General Contractor
- Noresco
- Engineer
- Plant ECI
- Duration
- 3 months
Installation of this design build/design assist, 103 kW DC photovoltaic (PV) system tied into the main distribution panel in Building U at the complex. The installation included: combiner boxes, an inverter, DC disconnects, AC disconnects, underground electrical from the AC disconnect; a bi-directional 150A, 3-phase, 480V breaker for the solar field; the string wiring from the PV modules to combiner boxes; and the installation of a weather station.