Home > Portfolio > Government > Denver Federal Center Phase II – 3.5 MW

Denver Federal Center Phase II – 3.5 MW

Lakewood, Colorado

  • DFCII 5
  • DFCII 3
  • DFCII 4
  • DFCII 1
  • DFCII 2
  • DFCII 6
General Contractor
E Light Wind and Solar, Inc.
Engineer
GreenLight Engineering, LLC
Duration
12 months

America's Greenest Federal Campus

Phase II of this design-build project included the installation of two, fixed position field arrays that total 2.39 megawatts DC and 14 carport structures with solar panels on top for 1.6 megawatts DC. A total of 14,352 panels were installed. The systems are tied to the existing electrical distribution system. This project was funded by the American Recovery and Reinvestment Act of 2009.

Additional Project Information