- General Contractor
- Weitz/Watts, A Joint Venture
- Engineer
- GreenLight Engineering
- Architect
- CPD Watts
- Duration
- 4 months
This 300 kW DC, design-build solar project was built at the Fort Carson Army Base. The array is located on several carport structures in the parking lot of a new Military Intelligence Battalion Headquarters building.
