- General Contractor
- NVT Licenses, LLC
- Engineer
- SunEdison, LLC
- Architect
- HDR
- Duration
- 6 months
This project includes the installation of a 10.8 MW DC solar photovoltaic system. The system is grid-tied and ground-mounted. The panels are installed on a single-axis tracker system.
