Home > Portfolio > Utility > Monument – 10.8 MW

Monument – 10.8 MW

Monument, NM

  • IMG_5078 with text
  • Picture 120
  • SANY0041
  • SANY0084
General Contractor
NVT Licenses, LLC
Engineer
SunEdison, LLC
Architect
HDR
Duration
6 months

This project includes the installation of a 10.8 MW DC solar photovoltaic system. The system is grid-tied and ground-mounted. The panels are installed on a single-axis tracker system.